Skip to main content

Grant Aerona Review UK (2026)

Quick Answer

Irish-headquartered heating brand with the R290 Aerona range, strong in rural and oil-replacement homes.

Data verified April 2026. UK installed pricing varies with installer, site and package.

At a Glance

OriginIreland (Grant Engineering, founded 1978), large UK presence
UK supportStrong in rural UK and off-gas areas, established oil-boiler heritage and installer base
Capacity / sizing6 kW – 17 kW (Aerona R290 range)
SCOP4.4+ at 35°C flow (Aerona R290, A7/W35)
Warranty7 years on the Aerona R290 with registration
Indicative UK price£8,500–£13,500 installed before BUS grant (-£7,500)

Strengths

Weaknesses

Who Grant Aerona Suits Best

Rural and off-gas homes replacing an oil boiler, where high flow temperatures and a trusted oil-era brand matter.

When to Avoid

You want the deepest smart-home integration, Daikin and Vaillant lead there.

Popular Models

Frequently Asked Questions

How much does a Grant heat pump cost in the UK?

Grant Aerona installations typically cost £8,500–£13,500 before the £7,500 Boiler Upgrade Scheme grant, bringing the net cost to roughly £1,000–£6,000 for most homes.

Is the Grant Aerona a good heat pump?

Yes, particularly for rural and oil-replacement homes. The Aerona R290 uses natural refrigerant, reaches high flow temperatures suited to older radiators, and carries a 7-year warranty on registration.

Does the Grant heat pump qualify for the BUS grant?

Yes. The Grant Aerona qualifies for the £7,500 Boiler Upgrade Scheme grant when installed by an MCS-certified installer in England and Wales. Note that Grant is the brand name, separate from the grant itself.

What refrigerant does the Grant Aerona use?

The current Aerona range uses R290 (propane), a natural refrigerant with very low global warming potential that also supports higher flow temperatures, useful for homes keeping existing radiators.

Compare with Other Heat Pump Brands

BrandUK supportWarrantyIndicative price
VaillantStrong, large UK installer and service network, significant G.A.S. partnership5 years standard; up to 10 years via accredited installer (G.A.S.)£9,000–£14,000 installed before BUS grant (-£7,500)View →
DaikinVery strong, large UK office, Daikin Sustainable Home Centre, extensive installer network3 years standard; extendable to 7 years via accredited installer£9,500–£14,500 installed before BUS grantView →
Mitsubishi EcodanVery strong, largest installer base of any ASHP brand in the UK7 years standard on accredited installs (Mitsubishi Electric Hybrid+ programme)£9,000–£13,500 installed before BUS grantView →
NIBEStrong, UK office plus VIP+ installer network (extended warranty programme)5 years standard; up to 10 years via VIP+ accredited installer£10,000–£15,000 installed before BUS grant (air source); significantly more for ground source with boreholesView →
Viessmann VitocalEstablished UK office and trained installer network, strong technical support5 years standard; extendable via accredited installers£9,500–£14,500 installed before BUS grantView →
Panasonic AquareaGood UK distribution and installer network, established air conditioning heritage5 years standard; up to 7 via accredited installers£8,500–£13,000 installed before BUS grantView →
Samsung EHSGrowing UK installer network, established air conditioning presence5 years standard; up to 7 via accredited installers£8,000–£12,500 installed before BUS grantView →
LG Therma VGrowing UK network, established HVAC and air conditioning presence5 years standard; up to 7 via accredited installers£8,500–£13,000 installed before BUS grantView →
AiraDirect Aira-employed installers and aftercare, not a traditional dealer networkLong warranty and performance guarantee as part of the Aira packageUpfront from around £6,500 net after grant, or a monthly subscriptionView →
Bosch CompressStrong, leans on the large Worcester Bosch heating installer base in the UKUp to 7 years via accredited installers£9,000–£14,000 installed before BUS grantView →
Ideal HeatingStrong UK manufacturing base and a large existing boiler installer networkUp to 7 years via accredited installers£8,500–£13,000 installed before BUS grantView →
MideaGrowing UK distribution; Midea also manufactures units badged by other brands5 years standard; extendable via accredited installers£7,500–£12,000 installed before BUS grantView →

Get a Quote Including Grant Aerona

Most MCS-certified installers carry multiple heat pump brands — ask for a quote specifying Grant Aerona if you want a heat pump from this brand. Use the form below to reach local installers.

Get Free Solar Quotes

Find out how much you could save with solar panels.

No obligation. 0% VAT on residential installs. All installers MCS-certified.

Sources

JR
John RooneySolar Energy Editor

John Rooney is the founder of Solar Info and has been covering the UK solar energy market since 2023. He researches every battery and inverter brand against manufacturer datasheets, MCS and Ofgem data, and feedback from the MCS-certified installers in our directory before publishing.

MCS data verifiedDatasheet-checked specsInstaller feedbackCovering UK solar since 2023
Last reviewed: June 2026
Free Solar Assessment